Audiovisual Deployment for Becton Dickinson
Date: October 24, 2024
Customer Name: Kinly
Industry: Corporate / Technology
Project Date: September 24, 2024
Location: Irvine, CA
Statement of Work: Audiovisual system installation and room commissioning across 97 spaces to support corporate communications and functionality. The scope includes site surveys, hardware installation, and system commissioning.
Challenge
The project involved upgrading the audiovisual systems across 97 diverse spaces within a large corporate facility in Irvine, CA. The rooms ranged from simple setups requiring only a display with a TX/RX and HDMI connection to more complex spaces that demanded comprehensive AV solutions. With a go-live date of September 24, 2024, the project required fast and efficient room surveying, installation, and commissioning while maintaining consistent reporting on the status and any action items requiring hardware replacements.
Additionally, quick response times for issues, along with the generation of actionable reports, were critical to ensure the success of the project.
Solution
The team executed a comprehensive AV deployment strategy, involving:
- Room Surveying & Documentation: Each of the 97 spaces underwent a thorough site survey, capturing full room images to provide visual references for remote understanding and future troubleshooting. This ensured anyone reviewing the images could gain an accurate sense of the room layout and configuration.
- Installation: For simpler rooms, we installed displays with TX/RX and HDMI connections to support straightforward content sharing. More complex rooms were equipped with fully integrated AV systems, enabling seamless communication and presentations.
- Commissioning: Once hardware was installed, each room was commissioned, ensuring that the audiovisual systems were fully operational and ready for immediate use by staff.
- Data Tracking: To manage the large number of spaces and equipment, an Excel tracker was used as the primary tool for logging details about each room’s configuration, equipment, and any issues requiring attention. This ensured that all progress and required actions were recorded systematically and could be easily referenced.
Technology Employed
- Displays: Standard displays with TX/RX and HDMI connectivity in simple rooms.
- Complex Systems: Fully integrated AV systems in larger or more complicated spaces.
- Commissioning Tools: Excel tracker for detailed data capture and reporting.
Results
The audiovisual upgrade across 97 rooms was successfully completed on time for the September 24th go-live date. The following outcomes were achieved:
- Efficient Room Setup: Each room, whether simple or complex, was surveyed, installed, and commissioned within the timeline. The clear room images and documentation allow for easy future reference.
- Effective Tracking and Reporting: The use of the Excel tool ensured real-time tracking of each space’s AV setup, issues, and overall progress. It also streamlined communication between the on-site team and management.
- Immediate Usability: All rooms were fully functional by the go-live date, enabling staff to utilize the spaces for their intended purposes.
Key Takeaways
This project underscores our ability to:
- Handle large-scale AV deployments efficiently, managing numerous spaces while ensuring each room’s unique requirements were met.
- Provide fast turnaround on identifying and reporting hardware issues, minimizing downtime and ensuring future-proofing.
- Deliver detailed documentation, using visual and data tools to ensure complete room understanding and support.
This project exemplifies our ability to manage complex audiovisual projects under tight deadlines, providing high-quality AV installations and ensuring long-term usability for the client’s corporate spaces.