| Location | Mon 07/20/2026 | Tue 07/21/2026 | Wed 07/22/2026 | Thu 07/23/2026 | Fri 07/24/2026 |
|---|---|---|---|---|---|
| San Diego | 5 | 5 | 5 | 5 | 5 |
| Los Angeles | 2 | 2 | 2 | 3 | 3 |
| San Francisco Bay Area | 2 | 3 | 3 | 2 | 2 |
| Texas | 3 | 3 | 3 | 3 | 3 |
| Seattle | 3 | 3 | 3 | 3 | 3 |
| Oregon | 3 | 3 | 2 | 2 | 2 |
| Arizona | 2 | 2 | 2 | 2 | 2 |
| Location | Mon 07/27/2026 | Tue 07/28/2026 | Wed 07/29/2026 | Thu 07/30/2026 | Fri 07/31/2026 |
|---|---|---|---|---|---|
| San Diego | 5 | 5 | 5 | 5 | 5 |
| Los Angeles | 3 | 3 | 4 | 5 | 5 |
| San Francisco Bay Area | 2 | 4 | 6 | 6 | 6 |
| Texas | 3 | 3 | 3 | 3 | 3 |
| Seattle | 2 | 2 | 3 | 3 | 3 |
| Oregon | 3 | 3 | 3 | 3 | 3 |
| Arizona | 3 | 3 | 3 | 3 | 3 |
・Cable Pulling
・Mounting Equipment (Wall, Ceiling, Floor, Inside Rack)
・Decommission
・Boxing / Unboxing
・On-site Logistics and Kitting
・All of the above
・Cable Management
・Connector Terminations
・Ability to interpret drawings and system functionality
・All of the above
・Signal flow understanding
・Basic System Troubleshooting
・Testing of the System
・All of the above
・Reporting to Project Manager
・Understanding of the Project Goals
・Understanding and Enforcement of Onsite Safety
・Communication with onsite POCs from other trades
・Sense of Urgency
・Uploading and adjusting code
・Acoustics knowledge to calibrate sound systems
・Networking knowledge to enable/disable ports, cascade switches, configure switches and routers